03 / SOURCE REGISTER

Evidence before inference.

Public policy establishes the trigger. FREDsense evidence establishes the field fit. Neither should be stretched beyond what the source supports.

06 SELECTED SOURCES

PUBLIC POLICY

01

CERCLA PFOA/PFOS designation

Federal liability context

EPA designation of PFOA and PFOS as hazardous substances provides a federal liability signal. A separate operational trigger connects the designation to a site specific field workflow.

View source
02

Proposed 2026 MSGP fact sheet

Federal stormwater watch

A proposed permit signal for industrial stormwater planning. Keep the lane in nurture until final language, applicability, and monitoring requirements are confirmed.

View source
03

Washington firefighting agents and equipment law

AFFF transition trigger

Washington guidance on PFAS containing firefighting foam and equipment is the policy starting point for the airport and fire equipment lane. Confirm site specific applicability and exemptions.

View source
04

North Carolina Session Law 2026-41

PFAS program planning

North Carolina PFAS program planning illustrates how a sampling deadline could connect to utility and industrial workflows. The example uses a Phase 1 sampling date of 31 December 2027.

View source

FREDSENSE EVIDENCE

05

FREDsense PFAS Field Kit

Field screening fit

FREDsense product information provides the basis for a rapid field screening discussion. Validate matrix suitability, operating conditions, and the required laboratory workflow.

View source
06

FREDsense and ECT2 AFFF Cleanout Case Study

Documented field workflow

A supplier published case study connecting FRED-PFAS to an AFFF cleanout workflow. The example connects field screening to equipment cleanout and sampling decisions.

View source